Expert Commissioning Services

Commissioning Mission Critical Facilities.

With precision, performance, and reliability.

Member firm

AABC Commissioning Group

Process

Level 0 through Level 5

Based

Atlanta, GA

3 verifiable credentials

At 2N Mission Critical, we deliver specialized design and commissioning services for electrical and mechanical systems supporting hyperscale data centers and other mission critical facilities, complemented by QA/QC solutions that ensure peak reliability and performance from construction through handover.

The work

Six levels, from the Owner’s Project Requirements through integrated systems testing, each one closed out in writing before the next begins.

The full process
  1. 0LevelPre-Design and Planning
  2. 1LevelDesign Phase
  3. 2LevelConstruction and Installation
  4. 3LevelPre-Functional Testing
  5. 4LevelFunctional Performance Testing
  6. 5LevelIntegrated Systems Testing

Our Credentials.

ACG Member Firm

2N Mission Critical Corp is a listed member firm of the AABC Commissioning Group, the certifying body for independent commissioning authorities.

ACG US member directory

CxA Certified

2N Mission Critical's electrical principal is listed in the ACG directory as a Certified Commissioning Authority (CxA), the credential owner specifications commonly require of a commissioning provider.

ACG US member directory

Independent of Design and Install

We are engaged by the owner and we install nothing. With no equipment line, no installation arm and no design fee involved, our verification carries no conflict of interest.

Rows of low voltage switchgear and motor control cabinets

Every termination, every sequence, every failure mode, documented.

Why Choose 2N.

A commissioning authority is engaged to provide the owner with an independent, documented verification of the facility.

Principal Level Involvement

A principal of the firm is directly involved in every project we commission, from submittal review through witnessed testing. The engineers on your project are accountable for its result.

Independent of Design and Construction

As a commissioning authority engaged by the owner, we hold no equipment line, no installation arm and no design fee. Findings are reported without a conflict of interest.

Documented at Every Stage

Each phase produces a record: the commissioning plan, test scripts, issues log, results and the turnover documentation. The documentation is the deliverable.

Level 5

Everything running together, at load, with something deliberately going wrong.

Where Downtime Is
Not an Option.

Commissioning ensures continuous power, cooling and control, safeguarding operations where downtime is not an option.

Confidence From Day One

Commissioning confirms that systems meet design intent, industry standards and client requirements, delivering confidence and peak performance from day one.

Hidden Failures, Found Early

By thoroughly testing every component, commissioning identifies and corrects hidden failures before they impact critical infrastructure.

Risk, Driven Down

Mission critical commissioning minimizes operational and financial risk by validating that all systems function under real-world and worst-case conditions.

Hyperscale Data Centers

The primary focus of the practice.

Colocation Facilities

Multi-tenant critical environments.

Hospitals

Where continuous systems are life safety.

Call Centers

Continuous communication systems.

Stock Exchanges

Where an outage is measured in transactions.

Flight Control Towers

Continuous communication and computer systems.

Why Commissioning Matters

Published industry data is consistent year over year, and it points to the systems commissioning exists to verify.

54%

of operators said power was the primary cause of their most recent impactful data center outage, the single largest category.

Uptime Institute Global Data Center Survey 2024, n=97

80%

said that outage would have been preventable with better management, processes or configuration.

Uptime Institute Global Data Center Survey 2024, n=97

57%

said their most recent major outage cost more than $100,000. One in five said it cost more than $1 million.

Uptime Institute Annual Outage Analysis 2026, reporting the 2025 survey

Uptime Institute's 2026 analysis identifies UPS systems, transfer switches and generators as the dominant failure points. These are the systems we verify, under load, across the failure modes they are designed to withstand.

Our Home Market

2N Mission Critical is based in Atlanta, currently the fastest growing data center construction market in North America.

2,882 MW

under construction in Atlanta, H1 2026, up 52.3% year over year

CBRE North America Data Center Trends H1 2026

No. 1

Atlanta overtook Northern Virginia as North America's top market for total data center construction for the first time in H1 2026

CBRE, H1 2026. Ranking is by capacity under construction

1%

Atlanta vacancy rate as the market ended March 2026

CBRE, reported by the Atlanta Journal-Constitution, June 2026

9,885 MW

of new energy approved for Georgia Power in December 2025, around 80% of it expected to serve data centers

Georgia Public Service Commission

Figures above are published by the named third parties and describe the Atlanta market, not 2N Mission Critical's portfolio.

Let Us Know About Your Project and the Schedule It Has to Meet.